Redlands School | NSW
ATCO Structures worked with architect Bloompark Consulting to complete the design, manufacture, and installation of seven senior temporary classrooms at Redlands School in Cremorne, NSW, Australia—the classrooms where a temporary structure to decant students during the construction of the school's new learning hub.
Padegoge and technology were key considerations in the design phase resulting in spacious open-plan classrooms emphasising allowances for existing technology used at the school.
The project took six months, including the design phase, manufacture and delivery, and installation. The modular building was installed with precision to ensure minimal disruption to the school environment.
One of the many benefits of modular manufacture is the ability to integrate with existing architectural aesthetics seamlessly. Permanent and temporary modular buildings are manufactured using the same materials as traditional construction methods maintaining the visual aesthetics of the school without compromising functionality.
Snapshot
Client: Bloompark Consulting
End Client: Redlands School
Location: Cremorne, NSW, Australia
Features:
- 12 senior school temporary classrooms